Chengetedzo yekumisikidza uye bvunzo muchina we hook mhando kupfura nenyunje muchina (

2021-06-03

Iyochiredzo mhando akapfura nenyunje muchinakazhinji ine chitarisiko chakakura, uye maitiro ekumisikidza ari akaomarara kupfuura eayo emidziyo midiki. Kururamisa kumisikidza uye bvunzo muchina ndiyo kiyi yekuona iko kwakajairika mashandiro eanotevera michina. Panyaya yemabasa ekutanga asina hunyanzvi, vashandisi vanofanirwa kutevedzera zvakatemwa mirairo yevashandi vanokodzera kana kutarisa mirairo. Kubvumidzwa kusingatenderwe kunogona kukonzera kukuvara kusingadzoreke kune iyochirauro bara nenyunje muchina. Iyoshot blasting machine manufacturer has sorted out the precautions for installation and test machine to share with you. I hope it will be helpful to users who use the device for the first time.
1. Installation. Iyochiredzo mhando akapfura nenyunje muchina is installed and debugged in the production plant and disassembled into several parts before being transported to the user site for installation. Although there is no pit, the foundation must be firm, the anchor bolt holes must be standardized, and the chamber body must be adjusted. After the second irrigation, the anchor bolt nuts can be tightened after solidification. After the chamber body is fixed, the various parts can be installed. Iyoprecautions for the installation and debugging of the relevant components are introduced below.
1. Shot nenyunje mudziyo:
Iyoshot blasting device has been installed on the chamber body before leaving the factory. Please pay attention to the problems to be debugged before use. Check whether the fixed positions of the blade, the pill wheel, the directional sleeve, and the guard plate are accurate and firm, and check whether the direction of rotation is correct after power on. Then adjust the position of the directional sleeve opening. Theoretically, the angle between the front edge of the directional opening and the front edge of the blade throwing position is about 900. After fixing the position of the directional sleeve, the position of the projectile belt can be detected by hanging Place a steel plate or wooden board on the position of the workpiece facing the exit of the shot blasting machine, start the shot blasting machine, put a small amount (2-5kg) of projectiles into the blasting tube, and then stop, check whether the hit position on the steel plate is suitable for the needs, such as Close the window of the bias-adjustable directional sleeve downwards, and vice versa, until it fits, and note the position of the directional sleeve opening as a basis for future replacement of the directional sleeve.
2. Takura uye sikuruwa conveyor:
Kutanga ita bvunzo dzisina mutoro kuti uone kana bhagidhi rinosimudza nemashizha anotenderera ari kumhanya nenzira kwayo, wozomisa bhandi rechisimudza kusvika padanho repakati rekutsemuka kuti usatsauka, wozoita bvunzo yemutoro kuti utarise iko kushanda uye kuendesa kugona, kunyangwe paine chero weirdness Ruzha uye kudedera, tarisa uye bvisa zvipingaidzo.
3. Pill-jecha separator:
Chekutanga tarisa kana kufamba kwegondohwe kuchichinjika, wobva watarisa kwakakodzera nzvimbo yekuparadzanisa ndiro, ipapo kana chitakuriso chakatakurwa nekugadziriswa, panoramba paine kuyerera kwesimbi kwepfuti, uye tarisa kana mabara esimbi ari kubuda uye kudonha kana chiuno chaburitswa